濟南公路路面水穩碎石基層攤鋪機施工工藝工法

來源:http://www.xiuxiuys.com/ 日期:2025-10-07

  1.1 工藝工法概況水泥穩定碎石基層是具有一定強度和剛度的路面結構層,是公路路面結構重要的組成部分,既保證鋪設路面有一定厚度,滿足承載負荷,又能減少建設成本。它可將路面承受的車輛荷載均衡的擴散到路基,具有一定的韌性。水泥穩定碎石基層施工分為平地機鋪筑和攤鋪機鋪筑,為了保證路面結構層的質量,高等級公路采用攤鋪機鋪筑。

  1.1 Overview of Technological Methods: Cement stabilized crushed stone base is a pavement structure layer with certain strength and stiffness, and is an important component of highway pavement structure. It not only ensures that the pavement has a certain thickness to meet the bearing load, but also reduces construction costs. It can evenly distribute the vehicle load borne by the road surface to the roadbed, and has a certain degree of toughness. The construction of cement stabilized crushed stone base is divided into flat machine paving and paver paving. In order to ensure the quality of the pavement structure layer, high-grade highways use paver paving.

  1.2 工藝原理水泥穩定碎石是以級配碎石為骨料,采用一定數量的水泥作為膠結材料,通過拌和、攤鋪、碾壓,利用碎石間的嵌擠鎖結形成具有一定強度的結構層。

  1.2 Process principle: Cement stabilized crushed stone is composed of graded crushed stone as aggregate and a certain amount of cement as bonding material. Through mixing, paving, and rolling, a structural layer with certain strength is formed by interlocking the crushed stones.

  2 工藝工法特點2.1作為路基與路面的過渡層,既能保證路面結構的厚度,又具有很好的剛度和強度。2.2 鋪筑水泥穩定碎石基層能很好的控制基層集料的均與性,避免了平地機鋪筑有可能造成的粗集料局部堆積,保證了基層的施工質量。

  2.1 As a transition layer between the roadbed and the pavement, it can ensure the thickness of the pavement structure while also having good rigidity and strength. 2.2 The laying of cement stabilized crushed stone base can effectively control the uniformity of the base aggregate, avoiding the possible local accumulation of coarse aggregate caused by the use of leveling machines, and ensuring the construction quality of the base.

  2.3 鋪筑水泥穩定碎石基層能夠充分保證基層的平整度和施工速度。3 適用范圍適用于高等級公路路面水泥穩定碎石基層攤鋪機攤鋪法施工。

  2.3 Laying cement stabilized crushed stone base can fully ensure the flatness and construction speed of the base. The scope of application is applicable to the construction of cement stabilized crushed stone base paving machine for high-grade highway pavement.

  4 主要引用標準《公路路面基層施工技術規范》JTJ 034;《公路工程質量檢驗評定標準》JTG F80;《公路土工試驗規程》JTJ 051;《公路工程無機結合料穩定材料試驗規程》JTJ 057;《公路路基路面現場測試規程》JTJ 059。5施工方法水泥穩定碎石基層是將水泥、碎石、水按照配合比試驗確定的比例經拌和,攤鋪、組合壓路機碾壓達到設計壓實度,經養護后構成的路面基層。應通過修筑試驗路段,取得各種施工參數制定標準施工方法后,進行大面積推廣施工。

  4. Main reference standards: "Technical Specification for Construction of Highway Pavement Base" JTJ 034; Quality Inspection and Evaluation Standards for Highway Engineering JTG F80; Code for Soil Testing of Highways JTJ 051; Test code for inorganic binder stabilized materials in highway engineering JTJ 057; Code for On site Testing of Highway Roadbeds and Pavements JTJ 059. The construction method of cement stabilized crushed stone base is to mix cement, crushed stone, and water according to the proportion determined by the mix proportion test, spread them, and combine them with a roller to achieve the design compaction degree. After curing, it forms the pavement base. After obtaining various construction parameters and establishing standard construction methods through the construction of test sections, large-scale promotion of construction should be carried out.

  施工準備(1)混合料拌和站的設置需要根據工程規模及地理位置綜合考慮場址、水、電、道路、材料供應、環境保護等各項要求選擇布置。建設完經過標定后方可投入使用。(2)在水泥穩定碎石層施工前應做好下承層驗收工作。下承層表面應平整、堅實、具有規定的路拱,沒有任何松散的材料和軟弱點。對于底基層,根據壓實度檢查(或碾壓檢驗)和彎沉測定結果,凡不符合設計要求的路段,必須根據具體情況,分別采用補充碾壓、加厚底基層、換填好的材料、挖開晾曬等措施,使達到標準。同時驗收時應逐一斷面檢查下承層標高是否符合設計要求,下承層標高的誤差應符合規范要求。新完成的底基層或土基,必須按規范規定項目及標準進行驗收。base64_image

  Construction preparation (1) The setting of the mixed material mixing station needs to be selected and arranged based on the project scale and geographical location, taking into account various requirements such as site, water, electricity, roads, material supply, and environmental protection. After construction and calibration, it can be put into use. (2) Before the construction of cement stabilized crushed stone layer, the acceptance work of the underlying layer should be done well. The surface of the lower layer should be flat, solid, and have the prescribed road arch, without any loose materials or soft spots. For the subgrade layer, according to the compaction degree inspection (or rolling test) and deflection measurement results, for any road section that does not meet the design requirements, measures such as supplementary rolling, thickening of the subgrade layer, replacement of filled materials, excavation and drying must be taken according to the specific situation to meet the standards. At the same time, during the acceptance inspection, each section should be checked to see if the elevation of the lower bearing layer meets the design requirements, and the error of the lower bearing layer elevation should comply with the specifications. The newly completed subgrade or soil foundation must be inspected and accepted according to the specified projects and standards.

  (3)現場技術人員必須對拌合站、壓路機、攤鋪機、運輸車輛、水車的操作人員進行培訓、技術安全交底,做到熟練掌握混合料的拌和、運輸、攤鋪、碾壓、協調等各個環節的技術要求。

  (3) On site technicians must provide training and technical safety briefing to operators of mixing stations, rollers, pavers, transport vehicles, and water trucks, in order to proficiently master the technical requirements for mixing, transportation, paving, rolling, coordination, and other aspects of the mixture.

  (4)在下承層上準確恢復中線。直線段每15—20m設一樁,曲線段每10—15m設一樁,測釬在兩側路面邊緣外30—50cm處采用鋼釬設置掛上鋼線(攤鋪基準線),測釬位置正確,支座牢固,測量準確、采用懸線法根據攤鋪厚度及松鋪系數每10m測量出鋼線標高,鋼釬應牢固順直以利于傳感器正常行走,鋼絲線的張力必須達800~1000N。6.2.2路肩培土按要求培肩,路肩壓實厚度應與攤鋪層壓實厚度相同,每隔30m左右兩側交錯開挖寬度為20-30cm的臨時泄水溝,確保路基排水通暢。

  (4) Accurately restore the centerline on the underlying layer. A pile is set every 15-20 meters for straight sections and every 10-15 meters for curved sections. Steel stakes are used to hang steel wires (paving reference lines) 30-50cm outside the edges of the road surface on both sides. The position of the stakes is correct, the support is firm, and the measurement is accurate. The suspended line method is used to measure the elevation of the steel wires every 10 meters based on the paving thickness and loose paving coefficient. The steel stakes should be firm and straight to facilitate the normal movement of sensors, and the tension of the steel wires must reach 800-1000N. 6.2.2 Shoulder soil should be leveled according to requirements, and the compacted thickness of the shoulder should be the same as the compacted thickness of the paving layer. Temporary drainage ditches with a width of 20-30cm should be excavated alternately on both sides every 30 meters to ensure smooth drainage of the roadbed.

  (1)培路肩(包括中央分隔帶):采用含水量適宜的粘土培肩;掛出路肩邊緣高度線,掛線高度應為基層厚度乘以土方松方系數,一般較設計的路肩(內側)寬度寬出20—30cm,人工攤鋪整平,培肩后用推土機穩壓兩遍,用振動式壓路機壓實,平地機刮平表面。培肩時應掛出培肩的外緣線和內側邊緣線,并用水準儀準確放出路肩松方厚度。

  (1) Shoulder training (including median strip): Use clay shoulder training with suitable moisture content; Hang the height line of the shoulder edge, which should be the thickness of the base layer multiplied by the soil loosening coefficient. Generally, it should be 20-30 cm wider than the designed shoulder (inner side) width. It should be manually spread and leveled, and after shoulder training, a bulldozer should be used to stabilize the pressure twice. A vibratory roller should be used for compaction, and a grader should be used to scrape the surface flat. When performing shoulder training, the outer and inner edge lines of the shoulder should be hung, and the loose thickness of the shoulder should be accurately measured with a level.

  (2)培肩質量要求:外邊緣和內邊緣順直且相互平行,表面平整,順適,縱向不能有起伏凹凸處,寬度、厚度滿足要求。

  (2) Quality requirements for shoulder training: The outer and inner edges should be straight and parallel to each other, the surface should be flat and smooth, there should be no undulations or bumps in the longitudinal direction, and the width and thickness should meet the requirements.

  (3)切槽:切槽前,先由履帶式拖拉機或裝載機初步穩壓,再由振動式壓路機碾壓密實,然后用平路機刮平表面,測量人員根據中線重新恢復路肩的邊緣線,掛線后人工切槽,切口豎直、切面平整順直、無波浪,不得有缺棱掉角的現象。切槽土保證清理干凈,沒有浮土,并將所有切除土運走。

  (3) Cutting groove: Before cutting groove, the crawler tractor or loader is first used to stabilize the pressure, and then the vibratory roller is used to compact it. Then, the surface is scraped flat with a leveling machine, and the measuring personnel restore the edge line of the shoulder according to the centerline. After hanging the line, the groove is manually cut, and the cut is vertical, the cut surface is flat and straight, without waves, and there should be no missing edges or corners. Ensure that the cut soil is clean and free of floating soil, and transport all the cut soil away.

  本文由  水穩碎石 情奉獻.更多有關的知識請點擊  http://www.xiuxiuys.com/   真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is dedicated to water stable gravel For more related knowledge, please click http://www.xiuxiuys.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

  • 上一條:濟南水穩砼:水穩與二灰以及砼的區別
  • 下一條:濟南攤鋪機出租
  • 相關產品:

    主站蜘蛛池模板: 衡南县| 高密市| 石首市| 宜阳县| 清水县| 永济市| 富平县| 邹城市| 高邮市| 偏关县| 县级市| 鄂尔多斯市| 涟源市| 隆德县| 拜泉县| 武乡县| 台南县| 巴林左旗| 宜兰县| 临猗县| 板桥市| 双桥区| 桦南县| 河南省| 三江| 霸州市| 武汉市| 桂阳县| 台山市| 长葛市| 漳平市| 开化县| 吉安县| 铜鼓县| 天台县| 博客| 容城县| 静宁县| 应城市| 枣强县| 正安县| 宣城市| 安阳县| 雷波县| 铁力市| 九江县| 徐闻县| 福州市| 兰州市| 攀枝花市| 漾濞| 惠来县| 新闻| 沭阳县| 和静县| 永定县| 玛多县| 商都县| 鹰潭市| 洪雅县| 临湘市| 云龙县| 高雄市| 青海省| 武定县| 建始县| 彭泽县| 方山县| 曲麻莱县| 广河县| 浏阳市| 崇礼县| 广安市| 云林县| 郓城县| 托里县| 甘肃省| 东安县| 扶沟县| 怀集县| 龙泉市| 仙居县|